HUDECO Group Spirit

HUDECO Group.

Creating the future with dedication and breakthrough technical solutions in a multi-industry ecosystem.

Zalo
Total Visits0
Online0

Ecosystem

  • HUDECO E&C
  • HSME
  • HDCS
  • HUDECO Invest
  • BKA-Geopet

Quick Links

  • Ecosystem
  • ESG
  • Projects
  • News
  • About

Contact Us

  • 496/82 Duong Quang Ham Str, An Nhon Ward, Ho Chi Minh City
  • 08 2705 2705
  • info@hudeco.com.vn

Copyright © 2026 HUDECO Group. All rights reserved.

Designed by Người HUDECO

Saigon centre project phase 3.
Demolition of Existing Structures and Construction of Fencing.• Completed

Saigon centre project phase 3.

Client

KEPPEL LAND WATCO.

Location

92 Nam Ky Khoi Nghia - Ho Chi Minh City.

Saigon centre project phase 3. - 1
Saigon centre project phase 3. - 2
Saigon centre project phase 3. - 3
Saigon centre project phase 3. - 4
Saigon centre project phase 3. - 5
5 Photos

Project Details

In December 2023, the Bid for Demolition of Existing Structures and Construction of a Fence was entrusted by the investor Keppel Land Watco to the contractor HUDECO.

In this bid, HUDECO is responsible for demolishing all existing structures on the nearly 10,000m2 land and constructing a 180m fence including advertising signs.

Regarding the demolition items, safety is the top priority factor. The special and also most challenging aspect is having to demolish a 40-year-old building, 5 stories high, located right next to the sidewalk in the bustling central area of the city. Meeting the strict safety requirements of the investor, along with the determination, carefulness, and seriousness of the BDH engineers, this difficult item has been successfully completed, ensuring the investor's expectations.

The project is expected to be completed in June 2024, completing this project will bring a clean image to the city's sidewalks and contribute to the urban renovation efforts in the central area of District 1.

Contact for Consultancy

Interested in similar services? Contact us for the most optimal solution consultancy.

Related Projects

Zone A1 belongs to the Ho Tram Complex Entertainment Tourism Area (Maia Resort Ho Tram).

Zone A1 belongs to the Ho Tram Complex Entertainment Tourism Area (Maia Resort Ho Tram).

Piling work (test piles and production piles)

Phuc Dat Tan Uyen Social Housing Apartment

Phuc Dat Tan Uyen Social Housing Apartment

Massive bored pile and diaphragm wall construction.

ECO GRAND LAND Model Rural Residential Area

ECO GRAND LAND Model Rural Residential Area

Construction of Technical Infrastructure - Transportation - Rainwater Drainage - Wastewater Drainage - Electrical Construction

View more
Our Latest Work

Latest Projects

View all
Complete Interchange No. 2 and the internal roads of the Celadon City project.

Supplies of bricks, cement, and wire mesh fencing.

Complete Interchange No. 2 and the internal roads of the Celadon City project.

Upgrade and expand Tan Son Nhat guesthouse

HSME

Upgrade and expand Tan Son Nhat guesthouse

Loi hai solar power plant – Ninh Thuan

Solar energy

Loi hai solar power plant – Ninh Thuan