Client
Sunlight Technology Radiation Joint Stock Company.
Location
Long Thanh - Dong Nai.
The project of the Ánh Dương irradiation plant is located at lot number 7, N7 Road, Amata Long Thành High-Tech Industrial Park, covering an area of over 2ha. Of which, the construction area is 1.3ha, including items: foundation treatment, construction of technical infrastructure, construction of the irradiation workshop, cold storage workshop serving irradiation technology and goods storage. The total investment of the project is 650 billion VND. The expected operation time is from the fourth quarter of 2024.
At the project, HUDECO Joint Stock Company has been entrusted by the investor to execute 3 package bids with a total value of more than 65 billion VND. Among them, the package for foundation treatment using CDM technology with a pile diameter of D800, the package for supplying and executing PHC piles D350A, and the package for constructing technical infrastructure.
The technical infrastructure package has been highly evaluated by the investor for its technical solutions, optimal improvements, and best responses to the project requirements. Ensuring quality, meeting deadlines, and the capacity of the contractor HUDECO.
Interested in similar services? Contact us for the most optimal solution consultancy.

Piling work (test piles and production piles)

Massive bored pile and diaphragm wall construction.

Construction of Technical Infrastructure - Transportation - Rainwater Drainage - Wastewater Drainage - Electrical Construction