HUDECO Group
Home
Ecosystem
ESG
Projects
News
Careers
About
HUDECO Group Spirit

HUDECO Group.

Creating the future with dedication and breakthrough technical solutions in a multi-industry ecosystem.

Zalo
Total Visits0
Online0

Ecosystem

  • HUDECO E&C
  • HSME
  • HDCS
  • HUDECO Invest
  • BKA-Geopet

Quick Links

  • Ecosystem
  • ESG
  • Projects
  • News
  • About

Contact Us

  • 496/82 Duong Quang Ham Str, An Nhon Ward, Ho Chi Minh City
  • 08 2705 2705
  • info@hudeco.com.vn

Copyright © 2026 HUDECO Group. All rights reserved.

Designed by Người HUDECO

Sycamore project - package bids lot B9, B10.
Test Pile, Load Test Pile, and Fence.• Completed

Sycamore project - package bids lot B9, B10.

Client

CAPITALAND GROUP

Location

Thu Dau Mot City - Binh Duong Province

Sycamore project - package bids lot B9, B10. - 1
Sycamore project - package bids lot B9, B10. - 2
Sycamore project - package bids lot B9, B10. - 3
Sycamore project - package bids lot B9, B10. - 4
Sycamore project - package bids lot B9, B10. - 5
5 Photos

Project Details

HUDECO and Thủ Đức 1 Centrifugal Concrete Joint Stock Company (TDC1) have completed the construction of test piles, pile load tests, and the fence for lots B9, B10 belonging to the Sycamore Project in Hòa Phú ward, Thủ Dầu Một city, Bình Dương province.

The Sycamore Bình Dương project is a strategic project of the CapitaLand group from Singapore, including: integrated projects, retail areas, integrated office areas, residential areas and housing, commercial areas, industrial zones, logistics blocks, and data centers. Notable for a total area of more than 18.9 hectares, including: 7 subdivisions of townhouses, villas, and apartments – 3,700 apartments and residences along with the largest shopping center in the region, green park areas, a system of schools at all levels, swimming pools, multi-purpose playgrounds,…

As part of the pile construction package for lots B9 - B10, HDC and TDC1 provide and construct 14 test pile centers, advertising sign fences, and over 45,000 m of PHC D600 piles (pile length from 30-40m) using the static pressing method. With the geology in the project area being quite complex, this is a major challenge for the contractor. With their experience, the contractor is committed to the investor to complete the project on time, ensuring the quality according to the specified technical requirements.

As of now, in mid-May 2024, HUDECO is preparing to start the mass pile construction work for the project.

Sincere thanks to the investor CapitaLand for their trust. Hopefully, after this project, it will open up many opportunities for collaboration with CapitaLand in the future.

Contact for Consultancy

Interested in similar services? Contact us for the most optimal solution consultancy.

Related Projects

Zone A1 belongs to the Ho Tram Complex Entertainment Tourism Area (Maia Resort Ho Tram).

Zone A1 belongs to the Ho Tram Complex Entertainment Tourism Area (Maia Resort Ho Tram).

Piling work (test piles and production piles)

Phuc Dat Tan Uyen Social Housing Apartment

Phuc Dat Tan Uyen Social Housing Apartment

Massive bored pile and diaphragm wall construction.

ECO GRAND LAND Model Rural Residential Area

ECO GRAND LAND Model Rural Residential Area

Construction of Technical Infrastructure - Transportation - Rainwater Drainage - Wastewater Drainage - Electrical Construction

View more
Our Latest Work

Latest Projects

View all
Complete Interchange No. 2 and the internal roads of the Celadon City project.

Supplies of bricks, cement, and wire mesh fencing.

Complete Interchange No. 2 and the internal roads of the Celadon City project.

Upgrade and expand Tan Son Nhat guesthouse

HSME

Upgrade and expand Tan Son Nhat guesthouse

Loi hai solar power plant – Ninh Thuan

Solar energy

Loi hai solar power plant – Ninh Thuan